01
Flats above premises
Clarify whether supplies and access are separate, especially where routes pass through shared areas.
London coverage / E2
Explain how the premises is arranged, where the consumer unit is and whether any landlord or freeholder permission is needed for routes through shared fabric.
01
Clarify whether supplies and access are separate, especially where routes pass through shared areas.
02
Provide opening hours, equipment and any period when isolation is possible.
03
Share room use, ceiling type and the intended atmosphere or task requirement.
01
Methodical diagnosis of tripping circuits, dead sockets, flickering lights and intermittent faults.
Service guide02
Interior, feature and task lighting planned around the room, controls and existing wiring.
Service guide03
Testing, alterations, power and lighting for offices, shops, studios and hospitality spaces.
Service guide04
Extra power where it is useful, from a single socket to a dedicated circuit for new equipment.
Service guideInclude loading or parking constraints, stairs, shared entrances and whether work must happen outside trading hours.
Common local enquiries
Potentially. Access, supply arrangements and any shared routes need to be described before the scope is agreed.
Yes. Provide the premises use, layout, existing controls and any fit-out programme.
Obtain the relevant approval before work that affects shared fabric or communal systems is scheduled.
Coverage hub
Not sure whether the postcode is within current coverage?
Send the E2 postcode, property details and the work needed. Coverage and scope will be confirmed from the enquiry.
Or call
07943 332024