01
Design
Rooms, loads, sockets, switches, lighting and specialist circuits are scoped before work begins.
Electrical service / Rewiring

01
Rooms, loads, sockets, switches, lighting and specialist circuits are scoped before work begins.
02
Cable routes and back boxes are installed while walls and ceilings are accessible.
03
Accessories, fittings and the consumer unit are connected after the appropriate finishes.
04
The installation is tested, labelled and certified, with agreed outstanding details closed out.
The scope should state which rooms and circuits are included, how the property will be occupied and who is responsible for making good, decoration and coordination with other trades.
Typical clients
Talk through rewiring.
Sometimes, particularly for a partial rewire, but it can be disruptive. The practical approach depends on access, room sequence and the extent of the work.
That must be stated in the quote. Tell us what finish you expect so electrical work, plastering and decoration can be separated clearly.