01
Before decoration
Agree socket, switch and lighting positions while cable routes remain accessible.
London coverage / E3
If renovation is involved, send the room plan and intended finish. Clarify which areas are in scope and how electrical work will be sequenced with plastering, joinery or decoration.
01
Agree socket, switch and lighting positions while cable routes remain accessible.
02
Identify the rooms changing now and whether the wider installation has a recent condition report.
03
Explain which rooms can be cleared and how power interruptions need to be managed.
01
A planned new electrical layout for renovations, extensions and older installations.
Service guide02
Modern protection, clear circuit labelling and a properly tested replacement for an ageing fuse box.
Service guide03
A documented assessment of fixed wiring for homeowners, landlords and commercial property managers.
Service guide04
Extra power where it is useful, from a single socket to a dedicated circuit for new equipment.
Service guideParking can be controlled on residential streets, so include any visitor permit, loading window or off-street access.
Common local enquiries
Before plastering and decoration where possible, once the room use, appliances, lighting and furniture layout are understood.
Yes. The condition of the existing installation and the boundary between old and new work need to be assessed clearly.
Provide the property type, room count, occupancy, plans if available and intended socket, lighting and appliance positions.
Coverage hub
Not sure whether the postcode is within current coverage?
Send the E3 postcode, property details and the work needed. Coverage and scope will be confirmed from the enquiry.
Or call
07943 332024